Investment in offshore wind farm need to think twice before building - investment offshore wind farm, investors - Electrical industry
Click to see more exciting information After 10 years of development, the world's offshore wind power technology is relatively mature, has begun to take shape. Offshore wind power has become the country's future development of wind power in Europe the main direction of our national resources, whether from the market or point of view, the development of offshore wind power is a very important aspect.
2010 1 22, the state promulgated the "development and construction of offshore wind Interim Measures" at the same time launched the first offshore wind power concession project report. There are indications that wind power resources, development of coastal countries the pace is accelerating.
Offshore wind power represents the commanding heights and wind energy technology development, as China's offshore wind power technology research related to the deepening and accumulation of offshore wind power is booming. Country Energy Council on the work of 2010 the overall energy requirements and tasks in the past asked that "in 2010, to continue to promote large-scale wind power base construction, particularly offshore wind power to be carried out together." Vestas
However experience shows that offshore wind power construction, development and operation, much more complex than land-based wind power. To ensure good performance of the wind power plant, needed two very important factors, one is a mature technology, the other is to have project development experience. In accordance with the requirements of the State Development and Reform Commission
conducting offshore wind power development for wind conditions before the conditions, set conditions, site conditions, environmental conditions, including a number of surveys, however, although many have basically divided up power giants the eastern coast of the sea wind, but wind farms at sea are few science research. "Although China has rich wind power resources in the sea, but the face of demands higher skills, more capital and greater risk of offshore wind farm construction, any investor will carefully indeed." A domestic wind power Investment Such an expert assessment of the company.
Past land wind power is relatively low risk, relatively simple. The difficulty of offshore wind power wind power equipment, in addition, there are construction difficulties, the land of wind power does not exist the problem, it is a mature technology lifting. Not the case at sea, maritime transport, basic construction is very difficult. High demands on equipment reliability, maintenance problems if the equipment cost is high. This is not alarmist talk. If you build offshore wind farm in northern China, then the sea of ice every winter will be the greatest threat to the safety of fans. In southern China, the typhoon has become a wind farm security, "the first killer." In general, the wind more than 10 hours of devastating wind power, can destroy the external device may also be due to the excessive speed caused the machine destroyed.
Offshore wind farm construction of comprehensive utilization related to the sea, sea ports, protected areas, transportation arteries, not all waters can build power plants, should avoid traffic facilities, urban construction and reclamation of these industrial port effective forms of development for the sea, so that the depth of the development of future adverse impact. So first come first provincial planning, to and Other Sector interface, to give overall consideration to the various uses of marine, after a further offshore wind power planning, companies can do in this context.